![]() She was built in Molotovsk, launched on 9 August 1957, commissioned in July 1958, and homeported at Zapadnaya Litsa on the Kola Peninsula. The vessel was prototyped in wood, with each of five segments scattered between five different locations about Leningrad, including the Astoria Hotel. К-3 was a project 627 "Кит" ( kit, meaning " whale" NATO reporting name " November") submarine of the Soviet Navy's Northern Fleet, the first nuclear submarine of the Soviet Union. First Soviet submarine to surface at the North Pole (1962).Ĩ × 533 mm bow torpedo tubes (20 torpedoes SET-65 or 53-65K). MG-200 "Arktika-M" sonar system for target detection, "Svet" detection of hydroacoustic signals and underwater sonar communication sonar system, "MG-10" hydrophone station (project 627 submarines had "Mars-16KP"), "Luch" sonar system for detection of underwater obstacles, "Prizma detection radar for surface targets and torpedo control, "Nakat-M" reconnaissance radar. ![]() Usually 104–105 men (including 30 officers) Submarine of project 645 had two liquid metal-cooled reactors VT-1 73 MW each and two more powerful turbine-type generators ATG-610 1,600 kW each, no diesel generators. Two water-cooled reactors VM-A 70 MW each with steam generators, two turbogear assemblies 60-D (35,000 hp total), two turbine-type generators GPM-21 1,400 kW each, two diesel generators DG-400 460 hp each, two auxiliary electric motors PG-116 450 hp each, two shafts. Submerged: 4,750 long tons (5,320 short tons).Surfaced: 3,065 long tons (3,433 short tons).Moored at the Nerpa Shipyard, planned museum ship
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |